Bijlage 1 Regeling instemming deelname aan Kyoto-projectactiviteiten

Regeling instemming deelname aan Kyoto-projectactiviteiten

1: Summary description of the CDM project activity Please complete Name of the project Project ID Number Location Name of the watercourse Date of completion of the Compliance Report 1.1. Project area 1. Description of the watershed: – Political and administrative boundaries – Communities located along – Principal land use patterns – Existing and planned river flow modifications – Average annual runoff (m3) 2. Average annual river flow (m3/s) 3. Average annual river runoff before and after project's implementation (m3) 4. State briefly what impacts other hydrological projects have had on the river basin within 50 km (untouched, affected, significantly affected by other activities). 5. Ecological description of the surroundings (forest, cultivated land, wasteland, cultural heritage sites etc.) conservation value. 1.2. Project-related activities 1. Type of water infrastructure (i.e. storage reservoir, run-of-river, other) 2. Related infrastructure being built as part of the project (i.e. roads, transmission lines, bridges) 3. Installed generation capacity (MW) 4. Load factor 5. Average annual energy production (MWh) 6. What role does the project play in the national/regional electricity supply (base load, peak load, load balancing services for the grid, support for intermittent renewables, etc.)? 7. Estimated annual emission reduction potential (tCO2e) 8. At what stage is the project’s construction at the time of this application? 9. What other direct purposes does the project serve (irrigation, flood control, water storage for drought protection, water-based transport, leisure facilities, aqua-culture, industrial and municipal water supply, etc)? 1.3. Project components Water-flow: structures and changes 1. Production capacity-submerged area (W/m2) 2. Retention structure/retarding structure (if present) 3. Type of water diversion 4. Length of diversion 5. Type of water inlet 6. Reservoir (if present) 7. Dam height (from the foundation) 8. Crest length 9. Reservoir are