Bijlage 13 Verordening PDV certificatie GMP diervoedersector 2003: quality Control of Feed Materials for Animal Feed GMP13; 11-4-2003

Verordening PDV certificatie GMP diervoedersector 2003

Preface 3 1 Introduction 4 2 Scope 6 3 Definitions 6 4 Basic Requirements 9 4.1 Basic Requirements for Producers 9 4.1.1 Awareness 9 4.1.2 Quality Control System 9 4.1.3 Quality Control Documentation 9 4.1.4 Independent verification 10 4.1.5 Management responsibility 10 4.1.6 Other documentation 10 4.2 Basic Requirements for Traders 11 5 Specific QC - Requirements 13 5.1 General 13 5.2 Product Specification 14 5.3 Production Process Specification 14 5.4 Hazard Identification 15 5.5 Risk Evaluation and Determination of Critical Control Points 16 5.6 Control Measures for Critical Points 17 5.7 Monitoring and Verification 21 5.8 Evaluation, Actualisation and Communication 22 6 Periodical External Verification Audit 23 7 Useful Documents 23 In June 2001 the Product Board Animal Feed (The Netherlands) laid down the first version of the Standard Quality Control of Feed Materials for Animal Feed. This standard is part of the scheme GMP+ Animal Feed, especially for the quality control of feed materials supplied from abroad. In the second half of 2001 we have had deliberations with UKASTA (United Kingdom) about the exchangeability of the Dutch QC-standard and the British FEMAS (Feed Material Assurance Scheme), both intended to assure the quality and safety of feed materials. In order to reach the exchangeability, we have added some elements in this version two of the QC - standard, especially in the explanations notes. Therefore, this version does not differ from the previous version substantially. The Product Board Animal Feed has determined this version in his meeting of 23 January 2002. At last, we want to emphasize that, when a foreign supplier has already a quality control program put in place, this QC - standard has not to replace it, or that a separate audit has to be carried out by the certification of verification body. We would support that the additional requirements in this standard are integrated in the existing quality system already put in place. And we would